INSTALLATION METHODS


Pad Mount is a clear plastic pad in which you apply clear silicone adhesive and tape the letter up (6-12 hours) until the silicone has a chance to dry.

Stud Mount is a 3/16"diameter 10-24 stud coming out the back. You can request spacers to allow your letter to stand off the mounting surface. We would need to know how much of a standoff you would like. Specify stud lengths of 1, 2, 3, 4, 5, or 6 inches. Specify if studs need to be in line for brick or block wall mortar joints. Drilling Pattern is Needed!

Combination Mount is a stud going through a pad on the top half of the letter and a pad mount on the bottom half. You would drill a 1/4" diam. hole to accommodate the stud. Fill hole with silicone and silicone the pad to the surface. Specify if studs need to be in line for brick or block wall mortar joints. Not for letters under 6 inches. Drilling Pattern is Needed!

Combination All Mount is a stud going through a pad on all locations. You would drill a 1/4" diam. hole to accommodate the stud. Fill hole with silicone. Specify if studs need to be in line for brick or block wall mortar joints. Not for letters under 6 inches.  Drilling Pattern is Needed!